      • 16/11/21 - Phoenix Construction Update – 16th November 2021
      • 21/09/21 - Phoenix Construction Update – 21st September 2021

        The first set of concrete has been poured in the corner of the site and reinforcement is being fixed. Reinforcement has also started at the bottom end of the site too.

        The Tower Crane bases are now in place.

      • 04/09/21 - Phoenix Construction Update – 4th September 2021

        Maslow capital complete £55m facility at a Phoenix.

        We are pleased to announce that specialist real estate development finance provider, Maslow Capital, has completed on a £55m development facility at Phoenix, Leeds.

        North Property Group are delighted to have played our part for Torsion Developments and Khalbros by securing 150 off-plan pre-sales to a mixture of both owner occupiers and investors, since launching it to market.

        The proposed city centre ‘Phoenix’ scheme, off Saxton Lane involves the demolition of two existing redundant industrial buildings and the construction of two high quality residential blocks, rising to 18 and 22 stories respectively to create an iconic ‘gateway’ development in a regeneration area of Leeds.

        The £82m GDV scheme will provide 367 apartments across the two blocks, together with high quality communal facilities, basement car parking, landscaping, public open space and highway works. Residential accommodation will also include a number of specially designed disabled accessible compliant apartments.

        The development is being constructed with state-of-the-art methods which include offsite manufacturing for the Frame and Facades. Using the pre-cast concrete ‘Crosswall’ system, ensures factory-controlled levels of production of both internal and external panels, delivered to site pre-glazed, and complete with integrated service ducts.

        The basement carpark, ground floor and first floor comprise of an in-situ concrete frame. The load from the precast units is transferred via a 1200mm thick first floor slab via the concrete columns down to a 1400mm thick concrete raft foundation.

        The blocks, consisting of a combination of elements of red and grey brickwork clad concrete panels together with both smooth and figured white concrete panels, are arranged around a central public open space. This north south pedestrian flow through the site, will connect residents and members of the public with other new developments and local amenities creating a new residential neighbourhood. Directly to the north of the site is the developing cycle super-highway, reinforcing links to the city-centre and surrounding areas.

        Tim Coen, Managing Director of North Property Group adds: “Since launching Phoenix, we have witnessed unprecedented uptake from both investors and homeowners, with more than 150 reservations agreed in just 6 months. It is clear the demand for premium quality apartments in central Leeds is at an all-time high.”

        We are excited to watch the construction of this site progress, as the highly anticipated development begins to make a dent in the Leeds skyline.

      • 31/08/21 - Phoenix Construction Update – Late August 2021

        Construction at the Phoenix site has continued and the overall construction is progressing well. The image and video below highlight the progress made thus far.

      • 26/08/21 - Phoenix construction update – August 2021

        Construction at the phoenix site has continued to undergo a smooth process and see good progress. See the PDF attached to view the progress made.

        Download Update

      • 02/07/21 - Phoenix construction update – July 2021

        As you can see from the images below there has been some great process on site. Following the successful demolition of the existing buildings and full site clearance, the main contractor has completed the installation of the perimeter king post retaining wall to retain back the highway footways and perimeter boundary. Reduce level dig is currently ongoing ready for new site formation levels. The building footprints have been cleared and is now ready for main sub-structure works.

      • 09/06/21 - Phoenix Construction update – 9th June 2021

        A king post wall is being constructed around the basement excavation at one end, while at the other end they have excavated the basement.

      • 01/06/21 - Phoenix construction update – Early June 2021

        The construction process at Phoenix is continuing to run smoothly. The excavation works continue as the Moorhead group presses on.

      • 28/04/21 - Phoenix construction update – Late April 2021

        Phoenix’s Construction is continuing to see a successful and smooth process, following the demolition and site clearance, excavation works have now begun with an array of earth drilling auger machines arriving on site to begin the excavation process.

      • 15/04/21 - Phoenix construction Update – April 2021
        The Moorhead Group arrive onsite. The Moorhead Group are a highly respected business specialising in pre-construction enabling works and operates from offices in Leeds, Derby and Stoke-on-Trent.
        Groundworks currently ongoing.
      • 08/04/21 - Phoenix construction update – April 2021

        The Construction of The Phoenix has continued to run smoothly. Following the complete clearance of the site, works have begun on the top end of the site; which is where Block B sits.

      • 15/03/21 - Phoenix construction update – March 2021 – EXCLUSIVE DRONE FOOTAGE
      • 01/02/21 - Phoenix construction update – February 2021

        A smooth and successful beginning to overall construction process of Phoenix, the demolition of the original buildings on the site has now been completed. Following the demolition, the site has been completely cleared and the initial hoarding has been erected.

      • 01/12/20 - Phoenix Construction update – December 2020

        The demolition process is continuing to run smoothly. The demolition of the building where Block B is being built has been completed. Demolition of the building where Block A is being constructed is about to begin.

      • 02/11/20 - Phoenix construction update – November 2020

        The demolition of the two original buildings has now begun. This is the beginning construction.

      • 01/10/20 - Phoenix construction update – October 2020

        The two original buildings are currently still in place. It is expected that the demolition is set to commence in the very near future, marking the beginning of the construction process of the Phoenix.

    • Property Description

      The Phoenix is an incredible development in Leeds that will stand at an impressive  17 stories tall. Phoenix will consist of 204 one bedroom apartments, 144 two bedroom apartments and 19 three bedroom apartments. The Phoenix will offer unrivalled views across the City Centre and will be a fantastic Leeds buy to let investment.

      Location

      The fantastic development  is situated in a prime City Centre location, set in the heart of the Cultural Quarter. The Phoenix is just a 2-minute walk from the Northern Ballet, Leeds College of Building, Leeds City College, Leeds Bus Station and BBC Yorkshire. The Phoenix is also just a 3-minute walk to the £300million SOYO project, as well as being just 10 minutes from the Leeds Playhouse, Kirkgate market, Aire Park, the £165m Victoria Gate Shopping Centre and Trinity Leeds. Boasting one of the most sought-after locations in Leeds, The Phoenix will appeal to a mixed demographic of tenants.

      Leeds investment case

      Leeds is fast becoming one of the best places in the UK to be a landlord. Its reasonable prices, high demand and fast growing population result in some of the highest yields in the country. Leeds also offers excellent capital growth, which contributes towards The Phoenix being a great opportunity for Leeds Buy to Let investors.

      The reasons for the city’s popularity with tenants is much the same as for the owner-occupiers. With many major companies – including, Sky, HMRC and Channel 4 – moving to Leeds, there are great employment prospects here.

      The huge variety of shop and entertainment options, as well its excellent transport links make Leeds a top choice.

      With so much that Leeds has to offer, it’s not surprising that Leeds is one of the countries hot-spots for buy-to-let investors. It is also one of the top choices for people moving away from London, keen to live somewhere with a better quality of life.

       

    Register Your Interest

    Integrated Form

    More Details

      Download Updates PDF

      Just fill in your details below and click 'download'.

      Integrated Form

      Call Us:
      Leeds: +44 (0) 113 4264 444
      Manchester: +44 (0) 161 2449 060

      Or Request A Call Back


      North Property Group is a member of the Property Ombudsman.

      CMP Logo

      Copyright © North Property Invest
      Powered By Spotlight Studios

      Registered in England and Wales, Registered Office: One Brewery Wharf, Waterloo Street, Leeds LS10 1GX, Company Number: 10761978

      Contact Us

      Integrated Form

      Join The Investors Club

      Integrated Form

      Calculate my Stamp Duty

      Register your Interest

      Integrated Form